An
on-line heavy iron-phosphate pre-treatment ensures the integrity
of the powder coating facility. Due to the minimisation of handling,
the process is not only cost effective but ideal for those industries
with critical minimum lead times.
To
ensure maximum process integrity, chemical testing is performed
on a daily basis. After pre-treatment, all parts pass through
a gas fired drying oven before going through the on-line electrostatic
powder coating system, and are finally baked at 180-210 degrees.
We
can also provide wet painting and lacquering. |